top of page

Framing Going Up


The framing is going up! 3 of the 4 walls are now on the trailer, with the final wall still in the show awaiting installation. We are still awaiting the final parts of the HDU 4 and 5(s) to arrive and until then the walls aren’t technically “secured to the trailer.” We have begun to square the walls using angular supports as seen in the rightmost image, but aren’t done yet. Once the last wall is up and squared, we will start to build the second floor framing and the loft floors.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
bottom of page