Walls Almost Done

A and B blocks both worked hard to complete the framing this week...but we came up a bit short on lumber for the left wall. We did not let that slow us down, however, as we raised the left, front, & "bayside" walls whilst we waited for the lumber to be delivered & installed the Simpson HDU clips (the metallic items visible in the photos) that solidly attach the framing to the trailer. We will complete the last bit of framing early next week, square the walls, install the 4x4 loft floor joists, & then install the LVL ridge beam. Please stay tuned for updates!