top of page
Search

Framing Going Up

  • Kyle Robertson
  • Mar 16, 2017
  • 1 min read

The framing is going up! 3 of the 4 walls are now on the trailer, with the final wall still in the show awaiting installation. We are still awaiting the final parts of the HDU 4 and 5(s) to arrive and until then the walls aren’t technically “secured to the trailer.” We have begun to square the walls using angular supports as seen in the rightmost image, but aren’t done yet. Once the last wall is up and squared, we will start to build the second floor framing and the loft floors.


 
 
 
Featured Posts
Recent Posts
Archive
Search By Tags

© 2017 by Cathy Landergan MHS

bottom of page